-
425 Market Street, San Francisco
Design-Build for Met Life, Cushman & Wakefield, and Studio TMT. The Lobby Remodel included both lobby's sides from floor to ceiling. Including all public elevators as well as new security systems. -
500 12th Street, Oakland City Center
5 Star Worldwide Conference Center
Class "A" Multi-Media facility. Tenant Improvement highlight; IT infrastructure amenities. Two (2) boardrooms, large events room, and private meeting rooms. -
Kenneth Rainin Foundation
155 Grand Avenue, 10th Floor, Oakland
4,870 sq-ft., Tenant Improvement success due to open lines with Property Managers Brandywine Realty Trust. Space features: two conferences rooms & 12 offices. -
Hitachi Corporation
700-750 Central Expressway Santa Clara
Design-Build Tenant Improvement. Worked spaned 136,050 sq-ft. New employee’s restaurant style cafeteria & full kitchen, conferences rooms, game room & patio. -
South-of-Market 888 Brannan Street
Opened to shoppers during Construction
Vantage Property Investors awarded contract to Richlen Construction to completely remodel the historical five (5) story building's interiors and exterior. -
Weaver Austin Villeneuve & Sampson Intellectural Property Law Firm
Location: 555 12th Street, 17th Flr.,Oakland. Richlen with RMW architects completed the Tenant Improvement and a spec suite for CBRE Group Inc. -
Anchorage Square at Fisherman's Wharf
2800 Leavenworth Street, San Francisco
Exterior & Interior renovations to the 3-story, 30-year-old building. It's home to business offices, restaurants, and 30 specialty shops. Work is continuous. -
360 22nd Street Plaza, Oakland
115,000 sq-ft. eight (8) stories of Tenant Improvements. Included Lobby Remodel space (4,641 sq-ft.) Richlen reconfigured & replaced storefront and sidewalks. Achieved LEED EB Certification. -
Bell Investments, 1111 Broadway, Oakland
6,800 sq-ft. Tenant Improvement with Upgrades to MEP. We assisted the Owner in achieving their vision. Stained wood base boards, red carpet throughout, floor to ceiling glass conference room, etc., -
Immersa Marketing
350 Rhode Island, San Francisco
High-end Corporate Tenant Improvement space 8,100 sq-ft., Completed in Two (2) Phases. Photo of "think tank" displays erasable glass wall. -
Attorney's Lounge Federal Courthouse
280 South First Street, San Jose
For GSA, 3,942 sq-ft Tenant Improvement. Scope new lounge, Conference rooms, private telephone stations, pantry, and copy room with work area. -
E*TRADE, Menlo Park
Preconstruction and Tenant Improvement services. Two (2) floors at 4500 Bohannon Dr., and One (1) floor at 4400. 16,568 sq-ft. Training room, conference rooms, server room, and kitchen & breakroom. -
Berman Devalerio
One California Street, San Francisco
Law Firm. Design-Build 15,000 sq-ft. Six (6) private offices, a conference room, boardroom, kitchenette with all essential appliances, completed with bar seating. -
State Street - Currenex
1700 Seaport Blvd., Redwood City
7,300 sq-ft. Tenant Improvement & upgrades to Network Room. CBRE Group project with Brereton Architects. Installed of New UPS System and HVAC Unit. -
275 Battery Street Lobby, San Francisco
Design Assist 5,250 sq-ft. Richlen helped the Owners prove to neighboring properties that repositioning can start with a lobby remodel, and most important it can be acheived cost effectively.
Richlen's News
- Read Richlen Contractor's San Francisco Blog Click "READ BLOG!"New Post February 1st, 2013
- Richlen Team Starts Regus Center TI 17,212 sq-ft. space at 951 Mariners Island Blvd in San MateoJanuary 13th, 2013
- 888 Brannan Street is opened during construction! "Work In Progress"2012-2013
- WINNER RICHLEN CONSTRUCTION Commercial Interiors Contractors Awards 2012 Building Lobby 425 Market Street Main Lobby WINS
- 2013 is Richlen Construction's 35th year Anniversary!1978 - 2013
425 MARKET STREET LOBBY WINS BEST "BUILDING LOBBY!"
Richlen Construction, general contractors of San Francisco is proud to announce that we have won 2012 best in "Building Lobby" for our main lobby remodel at 425 Market Street in San Francisco! Congratulations to Richlen's project team: Trip Collaro, Roger Wilson, Brad Davis, Twyla Summers, & Dino Collaro. Thank you as well to the entire staff at Richlen for supporting this project.
Richlen Construction Online Building Brochure
Our Services
- Full Tenant Improvement
- Building's Lobby Remodel
- Construction Management
- Think Preconstruction Now
- Spacious Design-Build
- LEED Accredited Professionals
- Timely Building Permits
- We Bond Projects
- MEP Engineered Upgrades
- On-Call Maintenance
- Budget Office Remodels
- In-house Value Engineering
- Abatement & Demolition
- Seismic Retrofits Upgrades
- Turn-key Spec Suites
- IT & Server Rooms
- Old & New Infrastructure
- GSA Capital Improvements
- Hardscape & Landscape
- Self Performed Work
-
Tenant Improvement • Lobby Remodel • MEP & Seismic Upgrades • Abatement • On-Call Maintenance • Infrastructure • Spec Suites • LEED • Design-Build
Richlen Construction © 2012 Lic. #570031 •
FTP Log-On •
About Us •
Services •
Clients •
Project Gallery •
In Progress •
Contact Us •
Site Map •
Privacy Policy



